Wastewater Treatment for Meat Processing Company

Meat and slaughter industries have many different type of wastewater involving animal fat, blood, high protein, bones and high BOD level. It is very significant to discharge the effluent safely to sewers, rivers or any other disposal areas. The right and efficient methods must be applied professionally to treat the wastewater and discharge the effluent. Basically 3 steps of wastewater treatment method is followed in meat and slaughter industrial wastewater treatment

These three steps are preliminary, secondary and tertiary treatment of effluent in a wastewater treatment plant.
Preliminary step is to remove solid waste from water with screening units, air flotation. Second step is to apply biological wastewater treatment by using microorganism. Combination of anaerobic and aerobic treatment is the most effective solution for a meat company. Third step is to discharge the water safely to land or sewers, for this to happen, chlorine or suitable disinfectants must be used. The remaining sludge can be disposed for landfill. In meat and slaughterhouse industry EGESIS has intense experience of wastewater treatment applications, methods and plant construction.

Please contact us for your meat and slaughterhouse factories’ wastewater treatment plant projects to get the most efficient and safe solutions.

Meat and Slaughterhouse Wastewater Treatment Plant Project (Migros)

A Country wide grocery chain slaughterhouse wastewater treatment plant has been completed and operational. The wastewater treatment plant is redesigned and had been revised according to needs of the slaughterhouse. As it is know if the capacity of the production facility increases, accordingly the wastewater amount increases and therefore the new units and extra revisions needed in wastewater plant.

  • 1.750 m3 of wastewater treatment capacity daily.
  • 4.000 mg COD/L
  • Revision of wastewater plant
  • Reconstruction of new units
  • Environmental technologies consultancy

Meat and Cattle Slaughterhouse Wastewater Treatment Plant Project (Efkar)

Efkar meat and slaughterhouse factory wastewater treatment plant is planned, constructed by our engineers with latest technologies in wastewater equipment. The whole project is turn key delivery and we also provide environmental consultancy services and training to the staff to operate the plant safely.

  • 570 m3 daily capacity to treat wastewater
  • 10.000 mg COD/L
  • Turn key project planning and construction
  • Environmental technologies consultancy
  • Management training for wastewater treatment plant